Cleveland Depot Restoration Progress, part 2

Since the last depot photos were posted, the interior demolition and floor joist repair have been completed.  Handicap ramp framing, door framing and floor repairs are in progress. The roof repair has begun; old shingles and bad roof planks are now being removed.  New wood and felt are being installed. The following photos were taken between 12/22/11 and 1/10/12.  The photo of the Norfolk Southern freight shows a modern day crew change.


Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s