Cleveland Depot Restoration Progress, part 4

The photos below were taken on 1/25/12.  As you can tell, work continues on the east side of the depot roof.  The old shingles and felt have been stripped off.  Bad roof planks have been removed and replaced with new ones, followed by new felt.  Roof leader underground storm piping is being installed and backfilled with crushed stone and tamped; this will be followed by the installation of brick pavers between the depot and the curbed parking lot.  The depot heating and cooling system ductwork is also being prepared for installation.

Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

One thought on “Cleveland Depot Restoration Progress, part 4

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s