Cleveland Depot Restoration Progress, part 6

The following restoration photos were taken between 2/17/12 and 2/23/12. The roof felt installation is complete. The facia board all around the perimeter of the roof has been installed, but has not been painted. Three rotten rafters have been removed and roof planking on the north end of the roof has been replaced with new wood. Wall and electrical work continues on the interior. Some of the plywood wall sheathing has been installed. Restroom piping is also currently being installed. The tedious job of removing the old paint from the north exterior wall as well as roof supports and overhang has just started.


Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s