Cleveland Depot Restoration Progress, part 7

The following restoration photos were taken between 3/1/12 and 3/12/12. All the paint on the north brick depot wall has been removed. The doorway in the north wall has been filled in with new brick in order to facilitate the installation of an original window. The doorway that was in the bay window has been removed and is being replaced with an original window. In addition, the doorway that was in the west wall has been removed and replaced by an original window. Electrical work continues inside along with the installation of the sheet rock ceiling. New roofing material is on order and should be installed shortly. Work continues on the re-painting of the roof supports and window trim.


Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s