Cleveland Depot Restoration Progress, part 10

The following restoration photos were taken between 4/16/12 and 4/26/12. These photos focus mainly on the exterior and interior painting progress. Work on the wainscoting and crown molding installation continues. Insulation has also been blown into the attic area during these listed dates. Three new doors are being installed — one on the east side, two on the west side of the depot. Two existing doors on the east side are also being reworked. A new wood roof support on the south side of the bay window is being fabricated to replace the old one that was rotten.


Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s