The following restoration photos were taken between 5/2/12 and 5/7/12. These photos focus mainly on the brick paver installation around the depot perimeter. The grading, tamping and paver placement was completed in 5 days. Painting of the interior continues. Ceramic tile has been laid on the restroom floors and walls. New air handling equipment and ductwork has been installed along with the depot’s gutters.
- 5.2.12 – Brick Pavers Preparation (Credit: Tom Rock)
- 5.2.12 – Brick Pavers Preparation (Credit: Tom Rock)
- 5.2.12 – Brick Pavers Preparation (Credit: Tom Rock)
- 5.2.12 – New East Side Porch and Gutters (Credit: Tom Rock)
- 5.2.12 – New Gutter Installation (Credit: Tom Rock)
- 5.3.12 – Brick Pavers Inst’l (Credit: Tom Rock)
- 5.3.12 – Brick Pavers Inst’l (Credit: Tom Rock)
- 5.3.12 – Brick Pavers Inst’l (Credit: Tom Rock)
- 5.3.12 – Brick Pavers Preparation (Credit: Tom Rock)
- 5.3.12 – Brick Pavers Preparation (Credit: Tom Rock)
- 5.3.12 – Interior Painting Progress (Credit: Tom Rock)
- 5.3.12 – Interior Painting Progress (Credit: Tom Rock)
- 5.3.12 – Interior Painting Progress (Credit: Tom Rock)
- 5.3.12 – Ticket Counter Construction (Credit: Tom Rock)
- 5.7.12 – Brick Pavers Inst’l Complete – West Side (Credit: Tom Rock)
- 5.7.12 – Brick Pavers Inst’l Complete – West Side (Credit: Tom Rock)
- 5.7.12 – Brick Pavers Inst’l Complete – East Side (Credit: Tom Rock)
- 5.7.12 – Brick Pavers Inst’l Complete – East Side (Credit: Tom Rock)
- 5.7.12 – Brick Pavers Inst’l Complete – East Side and North End (Credit: Tom Rock)
Rock on Trains © 2012, Tom Rock + T.D.R. Productions. All rights reserved. Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.