Cleveland Depot Restoration Progress, part 11

The following restoration photos were taken between 5/2/12 and 5/7/12. These photos focus mainly on the brick paver installation around the depot perimeter. The grading, tamping and paver placement was completed in 5 days. Painting of the interior continues. Ceramic tile has been laid on the restroom floors and walls. New air handling equipment and ductwork has been installed along with the depot’s gutters.


Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s