Cleveland Depot Restoration Progress, part 5

This next group of restoration photos were taken between 1/31/12 and 2/10/12. Roof repair and felt installation was completed on 2/7. The original window openings in the north wall that were bricked up have now been reopened. One large opening that was used as a doorway will be bricked in up to the window opening. The interesting thing about this building’s construction is that the walls are three bricks thick. New interior stud walls are now being installed.


Rock on Trains © 2012, Tom Rock + T.D.R. Productions.  All rights reserved.  Unauthorized use and/or duplication of this material without express and written permission from Tom Rock is strictly prohibited.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s